ISO 14971 Smart Assistant
Module 11 · ISO 14971 Smart Assistant
Decision‑aiding: verdicts, what‑ifs, ALARP justification, control option scoring
How to use this ISO 14971 tool
Step‑by‑step- Set your risk matrix. Go to Matrix Config and either click Apply Default 5×5 or customize the cells by clicking them (cycles A → L → N). Optional: enable RPN overlay.
- Add hazards. Open Hazard Log, fill the short form (ID, hazard, chain, Sᵢ/Pᵢ), tick control types, then hit Add to Log. Residual Sʳ/Pʳ can start equal to initial values.
- Get a decision. In the log, click Assist on any row (or Assist this Hazard from the form). The Decision Assistant shows the verdict (Acceptable / ALARP / Not acceptable), a recommended next step, and a trace of why.
- Explore what‑ifs. In Decision Assistant, move the S/P sliders to see category and RPN change in real time. Use this to set practical targets.
- Choose controls smartly. Add control options with ΔS/ΔP, cost, time, and regulatory burden. The MCDA table scores them; click Apply Best to update Sʳ/Pʳ.
- Document ALARP. Use the ALARP builder checkboxes to draft a justification, then Copy to Hazard Row. Edit as needed.
- Track field incidents. Open Post‑Production, add incidents, and watch the trend chart update. Export CSV for your PMS system.
- Generate reports. Go to Reports & Tests, build the RMP/RMR text, and export .txt files. Run Self‑Test to verify everything works.
- Save / Load / Export. Use the toolbar. Save writes to your browser; Export JSON lets you version the work; Import JSON restores it.
- Reset carefully. Reset wipes on‑page data and local storage for a clean start.
Tip: The Summary Tables condense the lessons for quick refreshers during a review.
Lesson 1 · Introduction to ISO 14971
ELI5 SummaryLesson 2 · Risk Analysis & Evaluation
Hazard → HarmOverall readiness: 0%
Lesson 3 · Risk Control & Mitigation
HierarchyLesson 4 · Post‑Production Information
Monitor → Update Incidents tracked: 0
Hazard Log & Risk Evaluation
Initial → Residual| ID | Hazard | Seq→HS→Harm | Sᵢ | Pᵢ | Catᵢ | Controls | V/V | Sʳ | Pʳ | Catʳ | Accept? | B/R | Owner | Due | Status | Notes | Actions |
|---|
Total: 0
Residual not acceptable: 0
Decision Assistant
Guidance & What‑ifs—
What‑if: S=3, P=3 → A (RPN 9)
Weights should sum ≈ 1.0
| Option | ΔS | ΔP | Cost (1–5) | Time (1–5) | Reg. (1–5) | Score |
|---|
Risk Matrix Configuration
Acceptability Acceptable (A)
ALARP (L)
Not acceptable (N)
Generate Reports
RMP / RMRTests chart lifecycle, matrix toggling, category calc, decision engine, MCDA.
Summary Tables
Lesson Snapshots| Lesson 1: Introduction to ISO 14971 | ||
|---|---|---|
| Topic | Summary | Example |
| Purpose & Scope | Framework to manage risks across the device lifecycle. | Wearable ECG: address incorrect readings. |
| Key Principles | Continuous, proportional risk management. | Blood glucose monitor updated from field data. |
| Application | Design → disposal; manufacturing, storage, distribution. | Pacemaker across design, production, PMS. |
| Lesson 2: Risk Analysis & Evaluation | ||
|---|---|---|
| Topic | Summary | Example |
| Risk Analysis | Identify hazards & estimate severity/probability. | Infusion pump software malfunction. |
| Risk Evaluation | Compare to acceptability criteria; decide actions. | Dosing inaccuracy evaluated vs thresholds. |
| Prioritization | Focus on highest impact risks. | Surgical tool fracture prioritized. |
| Lesson 3: Risk Controls | ||
|---|---|---|
| Topic | Summary | Example |
| Selection | Design → protective → info for safety. | X‑ray shielding added. |
| Implementation | Verify/validate control effectiveness. | Dose testing across conditions. |
| Residual Risk | Re‑estimate & evaluate; justify B/R if needed. | Dual‑sensor BP monitor residual acceptable. |
| Lesson 4: Post‑Production | ||
|---|---|---|
| Topic | Summary | Example |
| Monitoring & Review | Gather field data; update RM file. | Heart valve complication trends. |
| Feedback Mechanisms | Complaints, clinical, service logs inform improvements. | Complaints trigger labeling update. |